Modular Chemical Recycling Facility in Istanbul

Introduction: In Istanbul, we completed a chemical recycling facility designed as a modular industrial complex. The focal point was a distillation process requiring the highest standards in pipeline construction and plant planning.

Challenges: Thousands of pipelines had to be laid in a confined space, while keeping production and assembly times as short as possible. Additional complexity arose from the need for different grades of stainless steel (primarily 304L/316L) to ensure chemical resistance.

Solution: We relied on prefabricated plant components assembled in Cairo before shipment to Istanbul. Thanks to meticulous planning, all piping systems were completed and commissioned within just two months.

Result: By using this modular approach, on-site assembly time was drastically reduced. The client now operates a reliable, sustainable recycling plant that meets modern industrial construction standards and is cost-effective to run.

Facts (Project 11):

Tonnage Location Project Type Date
60 tons + 25 tons of stainless steel Istanbul Modular Industrial Construction April 2021