Modular Chemical Facility in Remote Indian Location

Introduction: In India, we constructed a modular chemical industrial facility in a remote region to enable efficient chemical production. The plant combines modern technology with a flexible steel construction design, leaving room for future expansions.

Challenges: Because the site is located “in the middle of nowhere,” transport and logistics played a crucial role. Prefabricated skids with up to 120 pipelines also had to be coordinated with special equipment from Germany and Italy, requiring precise scheduling.

Solution: We carried out complete preproduction and test commissioning in Cairo, so only final assembly and fine-tuning were needed on site. Timely delivery of all modules and coordinated assembly ensured a seamless installation process.

Result: The facility was brought online in just two months, offering high productivity and minimal downtime. Its modular concept also provides flexibility for any future expansion phases.

Facts (Project 19):

Tonnage Location Project Type Date
120 tons of steel, 20 tons of stainless India Modular Industrial Construction January 2024