Rapid Hall Construction for Carpentry in Hohenlohe
Introduction: In the Hohenlohe region, we constructed a new production hall for a family-run carpentry business urgently needing replacement facilities after a fire. Covering about 1,500 sqm, the hall was built swiftly using a modern steel framework and durable wall elements.
Challenges: The carpentry had to resume operations as quickly as possible, so we were given a tight deadline. Moreover, we faced challenging weather conditions during assembly, requiring robust construction methods to stay on schedule.
Solution: With experienced crews and prefabricated hall components, we began erection right after the building permit was issued. The contract was signed on August 1, and by December 1 the machines were already operating in the new hall.
Result: The carpentry benefited from a rapid return to full production and a modern hall designed for future expansion. Through our efficient hall construction approach, the company gained a long-lasting and functional workspace.
Facts (Project 2):
Tonnage | Location | Project Type | Date |
88 tons | Hohenlohe | Hall Construction | October 2023 |